The Ship · 1943–1952

Construction Log

From wartime sketches to the fastest crossing ever made by a liner: how the SS United States was designed, fought over in Washington and built in Virginia, dated from government records.

History · · Sources in the Crypt of Echoes

990 ftLength overall
53,329Gross tons
240,000Shaft horsepower, max. continuous
2,000 tonsAluminum used: 1,400 in the superstructure, 600 in fittings
13,000Troops she was designed to carry

Who paid for her: $77.7 million

  • National-defense features (government): $26.3 million (34%)
  • Construction subsidy (government): $18.6 million (24%)
  • United States Lines: $32.8 million (42%)

Source: HAER PA-647, National Park Service, 2012.

The log

  1. Design studies begin

    United States Lines commissions the first design studies for an advanced transatlantic liner while World War II is still on. Naval architect William Francis Gibbs of Gibbs & Cox leads the work.

    Source: HAER PA-647

  2. Design work starts

    Full design work begins on the ship, government design number P6-S4-DS1. She is meant to double as a fast troopship in a national emergency, which is how the government justifies paying for part of her.

    Source: HAER PA-647

  3. Shipyards bid

    Builders submit bids to construct the ship.

    Source: HAER PA-647

  4. Construction authorized

    The government authorizes construction. The contract is awarded on May 3 to Newport News Shipbuilding and Dry Dock Co. in Virginia, where she becomes hull No. 488.

    Source: HAER PA-647

  5. The Comptroller General objects

    A special report from the Comptroller General criticizes the deal. It says the government’s $25.4 million allowance for national-defense features is too high. The dispute over the subsidy and the sale price runs through the rest of construction.

    Source: 1952 audit report · FMB annual report, 1950

  6. Keel laid

    Work on the hull starts at Newport News. More than 5,000 shipyard workers and over 800 suppliers in 28 states would work on her.

    Source: HAER PA-647

    Deck plans from the ship’s construction drawings, sheet S1-3-3. National Archives, Maritime Administration drawings.
    Deck plans from the ship’s construction drawings, sheet S1-3-3. National Archives, Maritime Administration drawings. Source →
  7. A panel reviews the price

    After criticism from the Comptroller General and a House subcommittee, a three-man committee of experts is set up to review the prices at which the government agreed to sell the new passenger liners, this one included.

    Source: FMB annual report, 1950

  8. Drafted for the Korean War

    With the Korean War underway, the Secretary of Defense asks for four ships under construction, including the superliner, to be finished as troop transports. United States Lines cancels its design contract with Gibbs & Cox, and the government hires the firm directly. The sale to United States Lines is tentatively canceled in September.

    Source: FMB annual report, 1951 · 1952 audit report

  9. Released to be a liner again

    The Defense Department says it does not need her for military use, and she is released for her designed North Atlantic passenger service. The sale to United States Lines is reinstated.

    Source: FMB annual report, 1951

  10. Lifeboats with no wood

    The Coast Guard approves the ship’s specially designed lifesaving equipment. Her lifeboats are built without any wood, for fire resistance. Gibbs banned wood almost everywhere on board.

    Source: Treasury annual report, 1951 · HAER PA-647

  11. Christened

    The ship is christened at Newport News.

    Source: HAER PA-647

  12. The subsidy is recalculated

    The Federal Maritime Board orders its staff to recalculate the construction subsidy. The Board also calls its old national-defense calculations sound, so the $25.4 million figure the Comptroller General criticized looks set to stand.

    Source: 1952 audit report

  13. The audit goes to Congress

    The Comptroller General’s audit of the Maritime Board and Maritime Administration goes to Congress. It questions how the ship’s subsidies were figured and who pays for the redesign work.

    Source: 1952 audit report

  14. Sea trials

    On trials she reaches 38.32 knots at 247,785 shaft horsepower. Her true top speed stays a military secret until the Navy declassifies it in 1968.

    Source: HAER PA-647

  15. Delivered

    The ship is delivered to United States Lines. Her total cost is $77.7 million. The government pays $26.3 million for national-defense features and an $18.6 million construction subsidy; United States Lines pays $32.8 million.

    Source: HAER PA-647

    The first-class dining room, photographed in 1953. Gottscho-Schleisner, Library of Congress.
    The first-class dining room, photographed in 1953. Gottscho-Schleisner, Library of Congress. Source →
  16. Praised on the Senate floor

    Sen. Herbert O’Conor of Maryland puts a statement in the Congressional Record praising "the new superliner." He says she could carry 12,000 to 14,000 troops in an emergency.

    Source: Congressional Record

  17. The record crossing

    On her maiden voyage she crosses from New York’s Ambrose Lightship to Bishop Rock off England in 3 days, 10 hours and 40 minutes, averaging 35.59 knots. That wins the Blue Riband, the first time in about 100 years that an American ship has held it. Coming home, July 10–14, she averages 34.51 knots.

    Source: HAER PA-647

About the sources: These entries come from records of the Maritime Commission, Federal Maritime Board, Comptroller General, Coast Guard and Congress, and from the National Park Service's 2012 engineering history of the ship (HAER PA-647). Every source is preserved in the Crypt of Echoes. Most of these reports are scanned books, so check quotes against the page images.